salesdept@amerikooler.com 1.800.627.KOOL
Media Gallery
-
A Line of Doors
-
A Look Inside the Cooler
-
Assembling the Freezer
-
Assembling the Freezer 2
-
Assembling the Refrigerator
-
Assuring the Measurements
-
Beginning the Door Frame
-
Behind the Door
-
Bracing the Hinges
-
Building Electrical Box
-
Building on the Extension
-
Building the Walls
-
Built into the Wall
-
Crafting Insulation
-
Designing
-
Extending the Refrigerator Floor
-
Fastening the Insulation
-
Frame in the Wall
-
Half the Frame is Set
-
Hinge
-
Hinge 2
-
Hinge and Thermometer
-
In Design
-
In the Factory
-
In the Factory 2
-
Inside the Refrigerator
-
Installing Door Frame
-
Installing the Door
-
Insulation
-
Insulation 2
-
Insulation 3
-
Insulation 4
-
Insulation 5
-
Laying the Seal
-
Marking It
-
Measuring the Supports
-
Green House
-
Open Door
-
Preparing for Delivery
-
Processing Sheet Metal
-
Putting Up the Refrigerator Walls
-
Refrigerator
-
Refrigerator with Extended Floor
-
Roll in the Refrigerator
-
Scanning for Processing
-
Securing the Door
-
Securing the Edges
-
Securing the Frame
-
Setting the Other Panel
-
Shaping the Trim
-
Sheet Metal
-
Sheet Metal Roll
-
Silver Refrigerator
-
The AmeriKooler Mark
-
The AmeriKooler Mark 2
-
The Bracket
-
The Clip
-
The Door Installed
-
The Handle
-
The Handle 2
-
Green House 2
-
The Refrigerator is Complete
-
The Trim
-
C-Store
-
C-Store 2
-
Outdoor Compressor Installation
-
C-Store 3
-
Refrigerated Warehouse A1
-
Refrigerated Warehouse A2
-
Refrigerated Warehouse A3





